Type of PermitBasic CostAdditional CostNotes
Structures (greater than 150 square feet total area)
Residential
Buildings
$25$0.12 per square foot
total area
Total area includes all floor areas in living
spaces, basements, crawl space, lofts,
decks, and patios.
Commercial
Buildings
$25$0.15 per square foot
total area
Total area includes all floor areas in living
spaces, basements, crawl space, lofts,
decks, and patios.
Other Buildings,
Construction, or
Alterations
$25$3.00 per each $1,000
total cost
Other Structures$25$3.00 per each $1,000
total cost
Replacement Due
to Fire or Natural
Act
No cost (see
note)
No cost if replacement occurs within one
year of fire or natural act
Temporary
Buildings or
Structures
$25 per year
Demolition$25 (base)
Other
Certificate of
Occupancy
No cost
Recreational
Vehicle
$25 per
month (see
note)
Cost per month for a maximum of 120
calendar days. Permit not required for
storage of vehicle adjacent to primary
residence.
Driveway SignTBD (see
note)
Owners pay for sign if driveway accesses
more than 1 and less than 7 lots. Cost set
by Selectmen.
Conditional Use$50Plus costs (see note)
Cost of estimated
postage and public
notice(s) to be paid in
addition to basic cost fee
at time of application.
Additional costs may be required for
copying of materials, additional public
notice(s), additional postage, and
professional reviews. Payment must be
made in full before permit is considered
valid.
Variance Appeal$25Plus costs (see note)
Cost of estimated
postage and public
notice(s) to be paid in
addition to basic cost fee
at time of application.
Additional costs may be required for
copying of materials, additional public
notice(s), additional postage, and
professional reviews. Payment must be
made in full before permit is considered
valid.
Minor Subdivision$100Plus costs (see note)
Cost of estimated
postage and public
notice(s) to be paid in
addition to basic cost fee
at time of application.
Cost for Final Plan. Additional costs may be
required for copying of materials, additional
public notice(s), additional postage, and
professional reviews. Payment must be
made in full before permit is considered
valid.
DepositSee note2% of estimated costs of construction and
improvements to be deposited with the
Municipal Officers at least 5 days prior to
commencing construction.
Major Subdivision$50 per lot or
dwelling unit
(see note)
Plus costs (see note) Cost of
estimated postage and
public notice(s) to be paid in
addition to basic cost fee at
time of application.
Cost for Preliminary Plan. Additional costs may
be required for copying of materials, additional
public notice(s), additional postage, and
professional reviews. Payment must be made in
full before permit is considered valid.
$50 per lot or
dwelling unit
(see note)
Plus costs (see note) Cost of
estimated postage and
public notice(s) to be paid in
addition to basic cost fee at
time of application.
Cost for Final Plan. Additional costs may be
required for copying of materials, additional
public notice(s), additional postage, and
professional reviews. Payment must be made in
full before permit is considered valid.
DepositSee note2% of estimated costs of construction and
improvements to be deposited with the Municipal
Officers at least 5 days prior to commencing
construction.
Flood Hazard
Development
Permit
$50For new construction and substantial
improvements